New Map

Achievements till date

  1. Engagement of Engineering Design Firm for 24 Gully Erosion Sites across the State and the breakdown as per Senatorial Districts is as follows:

  1. Ondo Northern Senatorial District 9 sites

  2. Ondo Central Senatorial District 11 Sites

  3. Ondo Southern Senatorial District 4 Sites

  1. Consultant had submitted draft inception report, final inception report and draft Final report of the Engineering Design

  2. Engagement of a Geographical Information System (GIS) Consultant for GIS Based mapping of these sites above.

  3. The Consultant had submitted inception report and the project is awaiting draft final report.

  4. Engagement of a Consultant for the Rejuvenation of (100Ha) of degraded Forest Reserve.